BRITISH INDIAN OCEAN TERRITORY, DIEGO GARCIA (Feb. 26, 2025) The Diego Garcia Facility Response Team (FRT) conducted their final spill exercise, a simulated a ruptured hydraulic line on a crane from the moored asset during offload operations, February 26, 2025. The FRT was activated to respond and provide simulated containment and recovery operations. (U.S. Navy photo by Mass Communication Specialist Seaman Jordan Harrison)
Date Taken: | 02.25.2025 |
Date Posted: | 04.03.2025 23:23 |
Photo ID: | 8907449 |
VIRIN: | 250226-N-DI232-8000 |
Resolution: | 8256x5504 |
Size: | 2.1 MB |
Location: | IO |
Web Views: | 6 |
Downloads: | 1 |
This work, FRT Oil Spill Drill- Moored Asset [Image 6 of 6], by SN Jordan Harrison, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.