Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    HVAC system upgrade: Out with the old, in with the new [Image 9 of 10]

    HVAC system upgrade: Out with the old, in with the new

    HURLBURT FIELD, FL, UNITED STATES

    03.13.2024

    Photo by Senior Airman Alysa Calvarese 

    1st Special Operations Wing

    A U.S. Air Force Airman assigned to the 1st Special Operations Civil Engineer Squadron Heating, Ventilation and Air Conditioning shop, adds clear cleaner onto a PVC pipe while replacing a chiller at Hurlburt Field, Florida, March 13, 2024. Airmen with the 1st SOCES HVAC shop, ‘Dirt Boyz’ and the 823rd Red Horse Squadron, worked together to ensure the new HVAC system for the Chapel was properly and safely replaced. (U.S. Air Force photo by Senior Airman Alysa Calvarese)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.13.2024
    Date Posted: 03.15.2024 12:52
    Photo ID: 8290594
    VIRIN: 240313-F-RC297-1283
    Resolution: 8256x5504
    Size: 21.62 MB
    Location: HURLBURT FIELD, FL, US

    Web Views: 9
    Downloads: 3

    PUBLIC DOMAIN