U.S. Air Force Airmen from the 1st Special Operations Civil Engineer Squadron Heating, Ventilation and Air Conditioning shop attach equipment to a new chiller at Hurlburt Field, Florida, March 13, 2024. Replacing the chiller provides the Chapel with a more reliable air conditioning system to ensure Air Commandos and families will be comfortable while visiting the Chapel during the summer months. (U.S. Air Force photo by Senior Airman Alysa Calvarese)
Date Taken: | 03.13.2024 |
Date Posted: | 03.15.2024 12:52 |
Photo ID: | 8290583 |
VIRIN: | 240313-F-RC297-1141 |
Resolution: | 8256x5504 |
Size: | 20.26 MB |
Location: | HURLBURT FIELD, FLORIDA, US |
Web Views: | 33 |
Downloads: | 3 |
This work, HVAC system upgrade: Out with the old, in with the new [Image 10 of 10], by SrA Alysa Calvarese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.