Contractors from Brennan Construction work on providing divers below material to place on the lock floor. They measure the elevation to ensure proper height.
| Date Taken: | 12.20.2023 |
| Date Posted: | 12.27.2023 16:14 |
| Photo ID: | 8182037 |
| VIRIN: | 231220-O-JV047-8496 |
| Resolution: | 1620x1080 |
| Size: | 457.79 KB |
| Location: | CHICAGO, ILLINOIS, US |
| Web Views: | 59 |
| Downloads: | 3 |
This work, Brennan Construction crews measure the floor elevation during reconstruction of the Chicago Harbor Lock floor [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.