 
                
            Contractors use cranes as they continue construction to repair the Chicago Harbor Lock floor during the off-season.
| Date Taken: | 12.20.2023 | 
| Date Posted: | 12.27.2023 16:14 | 
| Photo ID: | 8182033 | 
| VIRIN: | 231220-O-JV047-4818 | 
| Resolution: | 3024x4032 | 
| Size: | 1.88 MB | 
| Location: | CHICAGO, ILLINOIS, US | 
| Web Views: | 34 | 
| Downloads: | 2 | 
 
                        This work, Construction of the lock floor continues at the USACE Chicago Harbor Lock [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.