Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock [Image 2 of 6]

    Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock

    CHICAGO, IL, UNITED STATES

    12.20.2023

    Photo by Emily Helton 

    U.S. Army Corps of Engineers, Chicago District

    Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock. Dredging is done to remove excess material from the lock.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 12.20.2023
    Date Posted: 12.27.2023 16:14
    Photo ID: 8182031
    VIRIN: 231220-O-JV047-8215
    Resolution: 1620x1080
    Size: 449.54 KB
    Location: CHICAGO, IL, US

    Web Views: 15
    Downloads: 3

    PUBLIC DOMAIN