 
                
            Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock. Dredging is done to remove excess material from the lock.
| Date Taken: | 12.20.2023 | 
| Date Posted: | 12.27.2023 16:14 | 
| Photo ID: | 8182031 | 
| VIRIN: | 231220-O-JV047-8215 | 
| Resolution: | 1620x1080 | 
| Size: | 449.54 KB | 
| Location: | CHICAGO, ILLINOIS, US | 
| Web Views: | 26 | 
| Downloads: | 3 | 
 
                        This work, Equipment waiting to be used on construction of the lock floor at the USACE Chicago Harbor Lock [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.