Station Apra Harbor 45-foot Response Boats weather the residual storm as U.S. Coast Guard crews in Guam begin assessments and reconstitution efforts on May 25, 2023, after Typhoon Mawar devastated the island. Crews are working to resume operations and reopen the ports. (U.S. Coast Guard photo Lt. j.g. Drew Lovullo)
Date Taken: | 05.25.2023 |
Date Posted: | 05.25.2023 04:52 |
Photo ID: | 7816840 |
VIRIN: | 230525-G-G0020-313 |
Resolution: | 1024x768 |
Size: | 104.84 KB |
Location: | GU |
Web Views: | 170 |
Downloads: | 4 |
This work, U.S. Coast Guard Forces Micronesia Sector Guam begins assessments, reconstitution after Typhoon Mawar [Image 13 of 13], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT