New signage for the Mr. Pat will be installed on the vessel at the end of the major maintenance which is currently being conducted at Memphis District Ensley Engineer Yard on the Mississippi River near Memphis. Mr. Pat left its permanent home near Sallisaw Oklahoma on January 3 and arrived in Memphis on January 12.
Date Taken: | 07.13.2022 |
Date Posted: | 07.14.2022 12:50 |
Photo ID: | 7316566 |
VIRIN: | 220713-A-MW145-0003 |
Resolution: | 1560x1170 |
Size: | 315.57 KB |
Location: | OKLAHOMA, US |
Web Views: | 11 |
Downloads: | 3 |
This work, Mr. Pat undergoing major maintenance on the Mississippi [Image 4 of 4], by Stacey Reese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.