The Mr. Pat sits in dry dock for repairs during a months long major maintenance project on the vessel. The work is being performed at the Memphis District Ensley Engineer Yard on the Mississippi River near Memphis. Mr. Pat left its permanent home near Sallisaw Oklahoma on January 3 and arrived in Memphis on January 12.
Date Taken: | 03.08.2022 |
Date Posted: | 07.14.2022 12:50 |
Photo ID: | 7316563 |
VIRIN: | 220308-A-A1413-0001 |
Resolution: | 1152x1280 |
Size: | 221.92 KB |
Location: | OKLAHOMA, US |
Web Views: | 11 |
Downloads: | 6 |
This work, Mr. Pat undergoes major maintenance on the Mississippi [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.