A campground volunteer blows leaves at the East Branch Clarion River Lake campground in Wilcox, Pennsylvania, May 26, 2021, for the dam's grand reopening. The ceremony celebrates the completion of the $250 million, East Branch Clarion River Dam Safety Modification project. The project began in 2014 and consisted of constructing a 2200 linear feet cutoff wall that penetrates up to 250 feet down through the middle of the earthen dam. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)
| Date Taken: | 05.26.2021 |
| Date Posted: | 05.28.2021 16:40 |
| Photo ID: | 6668596 |
| VIRIN: | 210526-A-TI382-0097 |
| Resolution: | 4928x3280 |
| Size: | 3.01 MB |
| Location: | WILCOX, PENNSYLVANIA, US |
| Web Views: | 25 |
| Downloads: | 3 |
This work, Cleaning up before cutting the ribbon on East Branch [Image 37 of 37], by Michel Sauret, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.