Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Reach B Construction Work 25Mar2021 [Image 5 of 11]

    Reach B Construction Work 25Mar2021

    SACRAMENTO, CA, UNITED STATES

    03.25.2021

    Photo by Joseph Bruton 

    U.S. Army Corps of Engineers, Sacramento District

    A backhoe shapes the earth around a turnout outlet at the Natomas Reach B construction site. The turnout outlet is used to control the flow of water into the canal from the Sacramento River.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.25.2021
    Date Posted: 04.22.2021 17:07
    Photo ID: 6611809
    VIRIN: 210325-A-PZ119-0131
    Resolution: 2250x1500
    Size: 3.21 MB
    Location: SACRAMENTO, CA, US

    Web Views: 9
    Downloads: 5

    PUBLIC DOMAIN