“Toledo Harbor has a 27-mile long shipping channel - it goes 10 miles upriver and 17 miles out to the lake. We remove an average of 700,000-750,000 cubic yards a year in Toledo - roughly the volume of the Empire State Building.” - USACE Buffalo construction representative Mark Schwab
| Date Taken: | 11.04.2020 |
| Date Posted: | 12.18.2020 15:26 |
| Photo ID: | 6462253 |
| VIRIN: | 201104-A-PG036-018 |
| Resolution: | 5489x3624 |
| Size: | 7.69 MB |
| Location: | US |
| Web Views: | 14 |
| Downloads: | 6 |
This work, Toledo Harbor/Maumee River dredging - Fall 2020 [Image 29 of 29], by Jess Levenson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.