(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Construction on new simulations training buildings continue at Fort McCoy [Image 45 of 47]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows two nearly completed commercial or institutional buildings under active construction, viewed across an open grassy field. Both structures feature brick masonry walls with dark metal hip roofs and appear to be identical or mirror designs. Construction materials including sand/gravel piles, a yellow construction vehicle, and a small trailer are visible on the site.

    Work on five new battle simulations buildings in the 200 block is shown June 11, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related infrastructure. The projected completion date is September 2020. The Fort McCoy Directorate of Public Works is overseeing the work completion. The new simulations buildings, when completed, will be managed by the Fort McCoy Directorate of Plans, Mobility, Training and Security. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 06.11.2020
    Date Posted: 06.16.2020 12:39
    Photo ID: 6242594
    VIRIN: 200611-A-OK556-897
    Resolution: 4941x3293
    Size: 2.3 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 13
    Downloads: 2

    PUBLIC DOMAIN