(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Construction on new simulations training buildings continue at Fort McCoy [Image 6 of 47]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows an active construction site featuring two nearly identical brick buildings with dark metal hip roofs, situated on a cleared and graded lot. Large mounds of excavated soil are piled between and around the structures, and erosion control silt fencing is visible along the perimeter. The site is bordered by a maintained grass field in the foreground and a tree line in the background.

    Work on five new battle simulations buildings in the 200 block is shown May 28, 2020, at Fort McCoy, Wis. Contractor MDM Construction Supply of Rockford, Ill., is constructing the new buildings and related infrastructure. The projected completion date is September 2020. The Fort McCoy Directorate of Public Works is overseeing the work completion. The new simulations buildings, when completed, will be managed by the Fort McCoy Directorate of Plans, Mobility, Training and Security. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 05.28.2020
    Date Posted: 06.16.2020 12:38
    Photo ID: 6242470
    VIRIN: 200528-A-OK556-382
    Resolution: 3477x2607
    Size: 1.16 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 17
    Downloads: 2

    PUBLIC DOMAIN