(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Road paving work at Fort McCoy [Image 5 of 26]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A road construction scene showing active grading and earthwork operations on what appears to be a road or parking area. A John Deere motor grader is working alongside a dump truck on freshly laid orange/red gravel or clay fill material. A 'Road Closed Ahead' warning sign is prominently displayed in the foreground.

    Contractors work on paving a road in the cantonment area May 7, 2020, at Fort McCoy, Wis. The road paving was part of work being done on several roadways over the three-week period at the installation in April and May 2020. The construction is being coordinated by the Fort McCoy Directorate of Public Works. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 05.07.2020
    Date Posted: 05.18.2020 16:09
    Photo ID: 6213521
    VIRIN: 200507-A-OK556-2039
    Resolution: 5831x3887
    Size: 3.93 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 15
    Downloads: 2

    PUBLIC DOMAIN