(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Road paving work at Fort McCoy [Image 10 of 26]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A road construction scene showing an orange motor grader spreading reddish-orange fill material (likely clay or gravel base) on a road surface. A dump truck is positioned ahead of the grader, likely having just deposited the fill material. The work is taking place in what appears to be a small institutional or military-style campus with white and red-roofed buildings on either side.

    Contractors work on paving a road in the cantonment area May 7, 2020, at Fort McCoy, Wis. The road paving was part of work being done on several roadways over the three-week period at the installation in April and May 2020. The construction is being coordinated by the Fort McCoy Directorate of Public Works. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 05.07.2020
    Date Posted: 05.18.2020 16:09
    Photo ID: 6213530
    VIRIN: 200507-A-OK556-386
    Resolution: 6000x4000
    Size: 5.25 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 13
    Downloads: 2

    PUBLIC DOMAIN