(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Final concrete shell placement sets project back on critical path [Image 3 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Final concrete shell placement sets project back on critical path

    GRAND RIVERS, KENTUCKY, UNITED STATES

    01.31.2020

    Photo by Mark Rankin 

    U.S. Army Corps of Engineers, Nashville District

    The U.S. Army Corps of Engineers Nashville District and its contractor partner Johnson Brothers put a 1.7 million pound concrete shell into position Feb. 2, 2020 on the riverbed on downstream end of Kentucky Lock where it will be part of a coffer dam and eventually a permanent part of the new lock wall for the Kentucky Lock Addition Project. It is the last of 10 shells. The lock is located at Kentucky Dam, which is a Tennessee Valley Authority project at Tennessee River mile 22.4. (USACE Photo by Mark Rankin)

    IMAGE INFO

    Date Taken: 01.31.2020
    Date Posted: 02.03.2020 15:56
    Photo ID: 6068103
    VIRIN: 200202-A-BO243-2262
    Resolution: 7360x4912
    Size: 16.71 MB
    Location: GRAND RIVERS, KENTUCKY, US

    Web Views: 38
    Downloads: 6

    PUBLIC DOMAIN