(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Final concrete shell placement sets project back on critical path [Image 6 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Final concrete shell placement sets project back on critical path

    GRAND RIVERS, KENTUCKY, UNITED STATES

    02.02.2020

    Photo by Leon Roberts 

    U.S. Army Corps of Engineers, Nashville District

    The U.S. Army Corps of Engineers Nashville District and contractor Johnson Brothers place the final concrete shell on the riverbed of the Tennessee River Feb. 2, 2020 below Kentucky Lock in Grand Rivers, Ky. It is the 10th concrete shell that is part of the permanent downstream lock wall and will double as part of a coffer dam for the Kentucky Lock Addition Project. (USACE photo by Leon Roberts)

    IMAGE INFO

    Date Taken: 02.02.2020
    Date Posted: 02.03.2020 15:56
    Photo ID: 6067930
    VIRIN: 200202-A-EO110-1002
    Resolution: 7360x4912
    Size: 22.71 MB
    Location: GRAND RIVERS, KENTUCKY, US

    Web Views: 51
    Downloads: 4

    PUBLIC DOMAIN