(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    2019 runoff event [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows an active flood control or levee construction operation along a waterway, with large mounds of sand and soil forming a berm or temporary dike running parallel to the water. A yellow piece of heavy construction equipment, likely a bulldozer, is visible in the mid-ground actively pushing or shaping the sand barrier. The trees are bare, suggesting late autumn or early spring conditions, and the water level appears elevated, consistent with flood conditions.

    The U.S. Army Corps of Engineers Omaha District fills in a breach on the Union Dike Friday, March 23, after it was damaged by runoff from the Platte River.

    IMAGE INFO

    Date Taken: 03.23.2019
    Date Posted: 03.24.2019 14:36
    Photo ID: 5204860
    VIRIN: 190323-A-A1408-0003
    Resolution: 3648x2736
    Size: 5.27 MB
    Location: US

    Web Views: 34
    Downloads: 3

    PUBLIC DOMAIN