(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Improvements to Kajaki dam power potential in southern Afghanistan [Image 1 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Military personnel in desert camouflage uniforms are working on or inspecting a large electrical switchgear or power distribution frame mounted against a weathered beige wall. The structure consists of a tall metal rack framework with multiple heavy cables, insulators, and a green electrical cabinet at the base. The setting appears to be a military installation or repurposed industrial facility in an arid region.

    Technicians with the U.S. Army Corps of Engineers and Afghan engineers assigned to the Kajaki hydroelectric power plant check the recently built electrical grid in the vicinity of the dam. The U.S. Army Corps of Engineers’ Afghanistan Engineer District-South and Afghan engineers recently completed installation of a primary switch center at the Kajaki dam to resolve electrical problems.

    IMAGE INFO

    Date Taken: 07.11.2011
    Date Posted: 07.14.2011 06:07
    Photo ID: 427483
    VIRIN: 110711-N-TH989-083
    Resolution: 2832x4256
    Size: 3.43 MB
    Location: KAJAKI, AF

    Web Views: 170
    Downloads: 9

    PUBLIC DOMAIN