Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USS Jackson Completes Final Contract Trials [Image 2 of 2]

    USS Jackson Completes Final Contract Trials

    PACIFIC OCEAN

    05.15.2017

    Courtesy Photo

    Commander, Littoral Combat Ship Squadron 1

    170515-N-AA727-018 SAN DIEGO (May 15, 2017) Fire Controlman 1st Class Niklaus Pegler, from Monette, Arkansas, conducts an inspection of the multi-function racks aboard Independence-variant littoral combat ship USS Jackson (LCS 6) during Final Contract Trials (FCT). FCT evaluates the material condition and performance of the ship’s major systems including main propulsion, ship control systems, combat systems, and damage control systems. After FCT, Jackson begins a Post Shakedown Availability, during which required repairs identified during combat systems ship qualification trails and FCT are made using contractor and program office money. (U.S. Navy photo by Fire Controlman 1st Class Christopher J. Bright)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 05.15.2017
    Date Posted: 05.23.2017 18:01
    Photo ID: 3414651
    VIRIN: 170515-N-AA727-018
    Resolution: 5568x3712
    Size: 8.46 MB
    Location: PACIFIC OCEAN

    Web Views: 65
    Downloads: 7

    PUBLIC DOMAIN