(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USS Jackson Completes Final Contract Trials [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USS Jackson Completes Final Contract Trials

    PACIFIC OCEAN

    05.03.2017

    Courtesy Photo

    Commander, Littoral Combat Ship Squadron 1

    170502-N-AA727-128 SAN DIEGO (May 02, 2017) Navy’s Board of Inspection and Survey (INSURV) personnel man a 11M ridged hull inflatable boat (RHIB) during launch and recovery operations aboard the Independence-variant littoral combat ship USS Jackson (LCS 6) during Final Contract Trials (FCT). FCT evaluates the material condition and performance of the ship’s major systems including main propulsion, ship control systems, combat systems, and damage control systems. After FCT, Jackson begins a Post Shakedown Availability, during which required repairs identified during combat systems ship qualification trails and FCT are made using contractor and program office money. (U.S. Navy photo by Fire Controlman 1st Class Christopher J. Bright)

    IMAGE INFO

    Date Taken: 05.03.2017
    Date Posted: 05.23.2017 18:01
    Photo ID: 3414649
    VIRIN: 170502-N-AA727-128
    Resolution: 5472x3648
    Size: 6.16 MB
    Location: PACIFIC OCEAN

    Web Views: 114
    Downloads: 10

    PUBLIC DOMAIN