160628-N-YL257-014 PORTSMOUTH, Va. (June 28, 2016) Aviation Support Equipment Technician 3rd Class Ranson Bullard repairs the vacuum adapter on a flight deck scrubber aboard the aircraft carrier USS George H.W. Bush (CVN 77). A flight deck scrubber removes debris and foreign object damage from the flight deck. GHWB is undergoing a planned incremental availability period at Norfolk Naval Shipyard. (U.S. Navy photo by Mass Communication Specialist 3rd Class Christopher D. Gaines/Released)
| Date Taken: | 06.28.2016 |
| Date Posted: | 07.06.2016 00:07 |
| Photo ID: | 2706164 |
| VIRIN: | 160628-N-YL257-014 |
| Resolution: | 4148x2760 |
| Size: | 886.15 KB |
| Location: | USS GEORGE H.W. BUSH, N/A, US |
| Web Views: | 16 |
| Downloads: | 34 |
This work, George H.W. Bush is undergoing a planned incremental availability period at Norfolk Naval Shipyard. [Image 305 of 305], by PO2 Christopher Gaines, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.