Photo by Melanie Oubre | U.S. Army Corps of Engineers, New Orleans District | 10.01.2024
Representatives from USACE, Lemoine-Frazier and our non-federal sponsors at the Coastal Protection and Restoration Authority (CPRA) and the Pontchartrain Levee District (PLD) attended a pre-final inspection at WSLP contract 110. At the inspection final punch list items were defined by USACE, CPRA, PLD and the contractor that will move the contract towards completion. Estimated completion of......
Photo by Melanie Oubre | U.S. Army Corps of Engineers, New Orleans District | 10.01.2024
Representatives from USACE, Lemoine-Frazier and our non-federal sponsors at the Coastal Protection and Restoration Authority (CPRA) and the Pontchartrain Levee District (PLD) attended a pre-final inspection at WSLP contract 110. At the inspection final punch list items were defined by USACE, CPRA, PLD and the contractor that will move the contract towards completion. Estimated completion of......
Photo by Ryan Labadens | U.S. Army Corps of Engineers, New Orleans District | 04.22.2024
The West Shore Lake Pontchartrain levee and floodwall alignment at contract 106 in St. John the Baptist Parish will cross the canal located between the east and west-bound lanes of Interstate 10. Once the sheet pile foundation is established, marine traffic will not be able to traverse the full length of the canal. Construction of the floodwall is scheduled to begin in mid-May....
Photo by Melanie Oubre | U.S. Army Corps of Engineers, New Orleans District | 08.01.2023
Completed 72” CMP access road crossing at WSLP 107
Photo by Melanie Oubre | U.S. Army Corps of Engineers, New Orleans District | 08.01.2023
Top of the 72” CMP access road crossing looking at the 60” CMP road crossing at WSLP 107.
Photo by Ryan Labadens | U.S. Army Corps of Engineers, New Orleans District | 08.01.2023
Joining up the pipe joints at the 60” CMP access road crossing at WSLP 107.
Photo by Melanie Oubre | U.S. Army Corps of Engineers, New Orleans District | 08.01.2023
Joining up the pipe joints at the 60” CMP access road crossing at WSLP 107.
Photo by Melanie Oubre | U.S. Army Corps of Engineers, New Orleans District | 08.01.2023
Completed clearing & grubbing of the levee and new drainage canal area looking west at WSLP 107.