(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Elevation Markers Indicate Future Top of Charleston Battery Extension Barrier [Image 2 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Elevation Markers Indicate Future Top of Charleston Battery Extension Barrier

    CHARLESTON, SOUTH CAROLINA, UNITED STATES

    09.11.2026

    Photo by Dylan Burnell 

    U.S. Army Corps of Engineers, Charleston District

    Marked survey tape designates the planned 10-foot NAVD88 top elevation of the proposed storm surge barrier near Brittlebank Park in downtown Charleston, South Carolina, Sept. 11, 2026, following precision topographic surveys conducted by the U.S. Army Corps of Engineers, Charleston District. The Charleston District designed the Battery Extension project, also known as the Charleston Peninsula Coastal Storm Risk Management project, to reduce flood risks to residents, roadways, and infrastructure during extreme coastal storm surge events. (U.S. Army Corps of Engineers photo by Dylan Burnell)

    IMAGE INFO

    Date Taken: 09.11.2026
    Date Posted: 09.11.2026 11:35
    Photo ID: 9927487
    VIRIN: 260911-A-SL031-1004
    Resolution: 5178x3452
    Size: 4.95 MB
    Location: CHARLESTON, SOUTH CAROLINA, US

    Web Views: 5
    Downloads: 0

    PUBLIC DOMAIN