Marked survey tape designates the planned 10-foot NAVD88 top elevation of the proposed storm surge barrier near Brittlebank Park in downtown Charleston, South Carolina, Sept. 11, 2026, following precision topographic surveys conducted by the U.S. Army Corps of Engineers, Charleston District. The Charleston District designed the Battery Extension project, also known as the Charleston Peninsula Coastal Storm Risk Management project, to reduce flood risks to residents, roadways, and infrastructure during extreme coastal storm surge events. (U.S. Army Corps of Engineers photo by Dylan Burnell)
| Date Taken: | 09.11.2026 |
| Date Posted: | 09.11.2026 11:35 |
| Photo ID: | 9927487 |
| VIRIN: | 260911-A-SL031-1004 |
| Resolution: | 5178x3452 |
| Size: | 4.95 MB |
| Location: | CHARLESTON, SOUTH CAROLINA, US |
| Web Views: | 5 |
| Downloads: | 0 |
This work, Elevation Markers Indicate Future Top of Charleston Battery Extension Barrier [Image 6 of 6], by Dylan Burnell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.