The Gary/Chicago International Airport, prepares to mark the completion of sanitary sewer upgrades and breaking ground on new storm and sanitary rehabilitation projects. Supported by Section 219 funding and a strong partnership with the U.S. Army Corps of Engineers Chicago District, these investments build the resilient infrastructure needed to drive economic growth and expand cargo operations across Northwest Indiana.
A photograph of an excavated utility pit with a conduit stub-up and an orange fiberglass extension ladder is shown during infrastructure construction work at Gary/Chicago International Airport. (Photo by U.S. Army Corps of Engineers)
| Date Taken: | 12.19.2024 |
| Date Posted: | 09.07.2026 13:09 |
| Photo ID: | 9917352 |
| VIRIN: | 241219-A-AZ289-9778 |
| Resolution: | 4032x3024 |
| Size: | 4.97 MB |
| Location: | GARY, INDIANA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, Gary /Chicago International Airport 2026 [Image 8 of 8], by Brigida Sanchez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.