A restored section of shoreline along the Potomac River Test Range at Naval Support Facility Dahlgren, where NAVFAC Washington stabilized more than 1,180 linear feet of riverbank with riprap, erosion-control matting and marsh grass plantings.
| Date Taken: | 07.07.2026 |
| Date Posted: | 09.01.2026 16:03 |
| Photo ID: | 9904412 |
| VIRIN: | 260707-N-AE927-1772 |
| Resolution: | 338x252 |
| Size: | 45.26 KB |
| Location: | WASHINGTON NAVY YARD, DISTRICT OF COLUMBIA, US |
| Web Views: | 6 |
| Downloads: | 0 |
This work, NAVFAC Washington Completes $4.5M in Shoreline and Stream Stabilization Efforts [Image 3 of 3], by Natasha Waldron Anthony, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.