U.S. Navy Sailors assigned to the Virginia-class fast-attack submarine USS North Carolina (SSN 777) handle mooring lines as they prepare to moor the vessel along the piers in Pearl Harbor, Hawaii, Aug. 12, 2026. The ship's force secured the submarine pier-side after a successful undocking evolution from Dry Dock 1 at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF).
North Carolina was commissioned May 3, 2008. North Carolina is the fourth Virginia-class submarine and the fourth U.S. Navy ship to be named for the Tar Heel state. North Carolina is assigned to Submarine Squadron 1 and capable of supporting various missions, including anti-submarine warfare, anti-surface ship warfare, strike warfare, special operations support, and intelligence, surveillance, and reconnaissance.
PHNSY & IMF’s mission is to keep the Navy’s fleet “Fit to Fight” by repairing, maintaining, and modernizing the Navy's fast-attack submarines and surface ships. Strategically located in the heart of the Pacific, it is the most comprehensive fleet repair and maintenance facility between the U.S. West Coast and the Far East. (U.S. Navy photo by Camey Streff)
| Date Taken: | 08.12.2026 |
| Date Posted: | 08.24.2026 14:37 |
| Photo ID: | 9882831 |
| VIRIN: | 260812-N-BN515-7946 |
| Resolution: | 4672x7008 |
| Size: | 6 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 5 |
| Downloads: | 4 |
This work, Pearl Harbor Naval Shipyard wraps up dry dock phase of North Carolina Maintenance [Image 12 of 12], by Camelia Streff, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.