A fully restored and configured mobile project trailer on Pier 5 stands ready to support shipyard personnel. The Code 900F.14 team completely overhauled the workspace, setting up tables, chairs, and monitors based on the specific operational needs of the incoming command codes for the Ford project.
| Date Taken: | 06.25.2026 |
| Date Posted: | 08.06.2026 07:11 |
| Photo ID: | 9853566 |
| VIRIN: | 260625-N-YO710-1010 |
| Resolution: | 6544x4363 |
| Size: | 4.52 MB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, NNSY Teams Prepare Pier 5 for Historic First Visit from USS Gerald R. Ford [Image 5 of 5], by Shelby West, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.