(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    MCED-P 26.1 - Maintenance is continuous [Image 3 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    An outdoor construction or earthmoving site showing a wheel loader actively pushing or moving piles of sandy/granular material in the foreground. Multiple pieces of heavy equipment, including red machinery, are visible in the background against a treeline. The scene appears to be a staging or grading area under clear, partly cloudy skies.

    PELELIU, PALAU

    07.14.2026

    Courtesy Photo

    1st Marine Logistics Group

    U.S. Marines with Marine Corps Engineer Detachment-Pacific 26.1 construct protective earthen berms as part of the Bulk Fuel Farm expansion project on Peleliu, Palau, July 14, 2026. These engineered barriers serve as critical secondary containment systems, designed to maintain strict environmental compliance. MCED-P is a partnership in the Indo-Pacific region that strengthens established relationships, bolsters theater security cooperation, and enhances the resilience of our allies and partners through community outreach, civic assistance, and infrastructure improvement projects. (Courtesy Photo)

    IMAGE INFO

    Date Taken: 07.14.2026
    Date Posted: 09.03.2026 17:22
    Photo ID: 9850773
    VIRIN: 260714-M-M0318-1001
    Resolution: 335x447
    Size: 71.71 KB
    Location: PELELIU, PW

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN