(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Dry Dock 8 Saltwater System Project Complete at Norfolk Naval Shipyard [Image 3 of 3]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Dry Dock 8 Saltwater System Project Complete at Norfolk Naval Shipyard

    PORTSMOUTH, VIRGINIA, UNITED STATES

    06.26.2026

    Photo by Daniel DeAngelis 

    Norfolk Naval Shipyard

    From left to right: NNSY Facilities Execution Branch (Code 900F.42) Facilities Execution Industrial Engineer Bradley Harrell, NNSY Dry Dock Engineering Branch (Code 900F.32) Dry Dock Engineering Technician Terry Babb, NNSY Code 900F.42 Construction Project Manager Ryan Nutt, and NNSY Code 900F.32 Dry Dock Engineer Alex Mayo in the recently completed Pumpwell 8 facility for Dry Dock 8. NNSY, Naval Facilities Engineering Command (NAVFAC) and contracting partners worked together to complete significant upgrades to Dry Dock 8’s pumpwell system in preparation for the new Gerald R. Ford-class aircraft carriers.

    IMAGE INFO

    Date Taken: 06.26.2026
    Date Posted: 08.04.2026 12:05
    Photo ID: 9848927
    VIRIN: 260626-D-XX785-1443
    Resolution: 2038x2845
    Size: 1.46 MB
    Location: PORTSMOUTH, VIRGINIA, US

    Web Views: 9
    Downloads: 1

    PUBLIC DOMAIN