Norfolk Naval Shipyard (NNSY), Naval Factilities Engineering Command (NAVFAC) and contracting partners have worked together to complete significant upgrades to Dry Dock 8's pumpwell system.
| Date Taken: | 06.26.2026 |
| Date Posted: | 08.04.2026 12:02 |
| Photo ID: | 9848919 |
| VIRIN: | 260626-N-XX785-1002 |
| Resolution: | 5973x3982 |
| Size: | 3.09 MB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 20 |
| Downloads: | 4 |
This work, Dry Dock 8 Saltwater System Project Complete at Norfolk Naval Shipyard [Image 3 of 3], by Daniel DeAngelis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.