(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    USACE Strengthens Storm Readiness with New Cat-5 Rated Lock Control Building at W.P. Franklin Lock and Dam [Image 8 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USACE Strengthens Storm Readiness with New Cat-5 Rated Lock Control Building at W.P. Franklin Lock and Dam

    ALVA, FLORIDA, UNITED STATES

    07.29.2026

    Photo by Peggy Bebb 

    U.S. Army Corps of Engineers, Jacksonville District

    Col. Brandon Bowman cuts the ceremonial ribbon, alongside the South Florida Operations Office team to mark the completion of the new lock control building at W.P. Franklin Lock and Dam. (Pictured from left to right: Johnnie Denson, W.P. Franklin Lead Lock and Dam Operator, Jason Pritt, W.P. Franklin Lock and Dam Operator, Col. Brandon Bowman, Greg Jones, Retired Chief of South Florida Operations Office, Lydia Graham, Acting Chief, South Florida Operations Office, Sarah Barnes, Engineering Technician and Christopher Rush, Lock and Dam Supervisor.

    IMAGE INFO

    Date Taken: 07.29.2026
    Date Posted: 08.04.2026 11:24
    Photo ID: 9848811
    VIRIN: 260729-A-JN142-2106
    Resolution: 2016x1512
    Size: 1.19 MB
    Location: ALVA, FLORIDA, US

    Web Views: 4
    Downloads: 0

    PUBLIC DOMAIN