District leaders and project team members cut the ceremonial ribbon marking completion of the new lock control building at W.P Franklin Lock and Dam. Pictured left to right: Nathaniel Earnshaw, Project Engineer, Gene Morisani, Chief of Construction Division, Tanner Clark, Chief of Operations Division, Col. Brandon Bowman, Jacksonville District Commander, Nolan Eusebio< West Palm Area Engineer, Lydia Graham, Acting Chief of the South Florida Operations Office, Jeff Fallin, Deputy Chief of Operations Division, and Brandon Burch, Chief of the Multi-Projects Branch.
| Date Taken: | 07.29.2026 |
| Date Posted: | 08.04.2026 11:24 |
| Photo ID: | 9848794 |
| VIRIN: | 260729-A-JN142-2102 |
| Resolution: | 2016x1512 |
| Size: | 1.09 MB |
| Location: | ALVA, FLORIDA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, USACE Strengthens Storm Readiness with New Cat-5 Rated Lock Control Building at W.P. Franklin Lock and Dam [Image 10 of 10], by Peggy Bebb, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.