(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Work continues on Tenkiller Bridge replacement project [Image 2 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Work continues on Tenkiller Bridge replacement project

    OKLAHOMA, UNITED STATES

    07.21.2026

    Courtesy Photo

    U.S. Army Corps of Engineers, Tulsa District

    Work continues on the Tenkiller Bridge replacement project near Gore, Oklahoma, July 22, 2026, where crews have erected sidewalk forms and made pours on Spans 9 and 10.

    Replacing the spillway bridge is a major infrastructure modernization effort. The original structure was removed completely and is being replaced with a new concrete bridge. The work is happening over an existing spillway while the dam continues to provide flood risk reduction and hydropower. (U.S. Army Corps of Engineers photo by Raymond Todd)

    IMAGE INFO

    Date Taken: 07.21.2026
    Date Posted: 07.22.2026 11:41
    Photo ID: 9824591
    VIRIN: 260721-A-A5050-1002
    Resolution: 1607x2142
    Size: 1.18 MB
    Location: OKLAHOMA, US

    Web Views: 2
    Downloads: 0

    PUBLIC DOMAIN