Mr. Adam Telle, Assistant Secretary of the Army for Civil Works, U.S. Army Corps of Engineers, and state and local official break ground on the Rough River Dam Rehabilitation Project at Rough River Lake, Kentucky July 21, 2026. The work is anticipated to take approximately six to eight years to complete. Phase 2 will involve creating a new outlet works on the left abutment which will consist of a new control tower and stilling basin with a new tunnel connecting the two features.
| Date Taken: | 07.21.2026 |
| Date Posted: | 07.21.2026 15:24 |
| Photo ID: | 9823052 |
| VIRIN: | 260721-A-GI410-2645 |
| Resolution: | 3000x2000 |
| Size: | 2.28 MB |
| Location: | KENTUCKY, US |
| Web Views: | 6 |
| Downloads: | 0 |
This work, Rough River Dam Rehabilitation Project Groundbreaking [Image 2 of 2], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.