(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Rough River Dam Rehabilitation Project Groundbreaking [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Rough River Dam Rehabilitation Project Groundbreaking

    KENTUCKY, UNITED STATES

    07.21.2026

    Photo by Michael Maddox 

    U.S. Army Corps of Engineers, Louisville District

    Mr. Adam Telle, Assistant Secretary of the Army for Civil Works, U.S. Army Corps of Engineers, and state and local official break ground on the Rough River Dam Rehabilitation Project at Rough River Lake, Kentucky July 21, 2026. The work is anticipated to take approximately six to eight years to complete. Phase 2 will involve creating a new outlet works on the left abutment which will consist of a new control tower and stilling basin with a new tunnel connecting the two features.

    IMAGE INFO

    Date Taken: 07.21.2026
    Date Posted: 07.21.2026 15:24
    Photo ID: 9823052
    VIRIN: 260721-A-GI410-2645
    Resolution: 3000x2000
    Size: 2.28 MB
    Location: KENTUCKY, US

    Web Views: 6
    Downloads: 0

    PUBLIC DOMAIN