(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Groundbreaking ceremony for Rough River Dam Safety Modification project marks beginning of work on Phase 2 [Image 2 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Groundbreaking ceremony for Rough River Dam Safety Modification project marks beginning of work on Phase 2

    KENTUCKY, UNITED STATES

    07.21.2026

    Photo by Michael Maddox 

    U.S. Army Corps of Engineers, Louisville District

    Mr. Adam Telle, Assistant Secretary of the Army for Civil Works, speaks to the crowd during the Rough River Dam Rehabilitation Project Groundbreaking at Rough River Lake, Kentucky July 21, 2026. The work is anticipated to take approximately six to eight years to complete. Phase 2 will involve creating a new outlet works on the left abutment which will consist of a new control tower and stilling basin with a new tunnel connecting the two features.

    IMAGE INFO

    Date Taken: 07.21.2026
    Date Posted: 07.21.2026 15:24
    Photo ID: 9823049
    VIRIN: 260721-A-GI410-5737
    Resolution: 3000x2000
    Size: 1.51 MB
    Location: KENTUCKY, US

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN