Mr. Adam Telle, Assistant Secretary of the Army for Civil Works, speaks to the crowd during the Rough River Dam Rehabilitation Project Groundbreaking at Rough River Lake, Kentucky July 21, 2026. The work is anticipated to take approximately six to eight years to complete. Phase 2 will involve creating a new outlet works on the left abutment which will consist of a new control tower and stilling basin with a new tunnel connecting the two features.
| Date Taken: | 07.21.2026 |
| Date Posted: | 07.21.2026 15:24 |
| Photo ID: | 9823049 |
| VIRIN: | 260721-A-GI410-5737 |
| Resolution: | 3000x2000 |
| Size: | 1.51 MB |
| Location: | KENTUCKY, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, Groundbreaking ceremony for Rough River Dam Safety Modification project marks beginning of work on Phase 2 [Image 2 of 2], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.