(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Work continues on Tenkiller Bridge replacement project [Image 2 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Work continues on Tenkiller Bridge replacement project

    GORE, OKLAHOMA, UNITED STATES

    06.02.2026

    Photo by Stacey Reese 

    U.S. Army Corps of Engineers, Tulsa District

    Work continues on the Tenkiller Bridge replacement project near Gore, Oklahoma, June 2, 2026, where crews are placing ultra-high performance concrete between the pre-cast panels to form the bridge deck.

    Replacing the spillway bridge is a major infrastructure modernization effort. The original structure was removed completely and is being replaced with a new concrete bridge. The work is happening over an existing spillway while the dam continues to provide flood risk reduction and hydropower. (U.S. Army Corps of Engineers photo by Stacey Reese)

    IMAGE INFO

    Date Taken: 06.02.2026
    Date Posted: 06.09.2026 16:55
    Photo ID: 9737959
    VIRIN: 260602-A-MW145-1267
    Resolution: 6048x4032
    Size: 5.52 MB
    Location: GORE, OKLAHOMA, US

    Web Views: 6
    Downloads: 1

    PUBLIC DOMAIN