Contractors with McCormic perform repairs on Tainter Gates 14 and 15 at the Robert S. Kerr Lock and Dam spillway near Sallisaw, Oklahoma, June 2, 2026.
The repair contract includes addressing steel section loss, replacing gates seals, rehabilitating the cathodic protection system and applying protective coatings to help extend the service life of the gates and ensure their continued reliable operations. The work supports the U.S. Army Corps of Engineers' mission to maintain critical water resources infrastructure. (U.S. Army Corps of Engineers photo by Stacey Reese)
| Date Taken: | 06.02.2026 |
| Date Posted: | 06.08.2026 17:08 |
| Photo ID: | 9735064 |
| VIRIN: | 260602-A-MW145-1277 |
| Resolution: | 6048x4032 |
| Size: | 7.33 MB |
| Location: | SALLISAW, OKLAHOMA, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Contractors perform repairs on Tainter Gates 14 and 15 at Robert S. Kerr [Image 2 of 2], by Stacey Reese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.