(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Earthwork is first work in Oologah Dam spillway repair [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Earthwork is first work in Oologah Dam spillway repair

    OOLOGAH, OKLAHOMA, UNITED STATES

    05.26.2026

    Photo by Brannen Parrish 

    U.S. Army Corps of Engineers, Tulsa District

    A crawler dozer pushes material during construction of a coffer dam in the Verdigris River below Oologah Dam in Rogers County, Okla., May 26, 2025. The coffer dam will prevent water from re-entering the work area while concrete is replaced in the Oologah Dam stilling basin. The stilling basin reduces speed and force from water releases to prevent bank erosion near and downstream of the dam.

    IMAGE INFO

    Date Taken: 05.26.2026
    Date Posted: 06.04.2026 13:04
    Photo ID: 9725023
    VIRIN: 260526-A-PO406-3898
    Resolution: 3000x1636
    Size: 1.96 MB
    Location: OOLOGAH, OKLAHOMA, US

    Web Views: 6
    Downloads: 0

    PUBLIC DOMAIN