A contractor sprays water on a Dry Dock 4 anchor at Puget Sound Naval Shipyard & Intermediate Maintenance Facility in Bremerton, Washington, May 19, 2026. After anchors are inspected and accepted, the contractor performs a wash-down of the dock walls to collect any remaining debris from installation. (U.S. Navy photo by Jeb Fach)
| Date Taken: | 05.19.2026 |
| Date Posted: | 05.28.2026 14:42 |
| Photo ID: | 9712285 |
| VIRIN: | 260519-N-TS621-2003 |
| Resolution: | 6000x4000 |
| Size: | 10.54 MB |
| Location: | BREMERTON, WASHINGTON, US |
| Web Views: | 16 |
| Downloads: | 3 |
This work, Dry Dock 4 Seismic Upgrade Completion Photos [Image 5 of 5], by Jeb Fach, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.