Airmen assigned to the 355th Component Maintenance Squadron stand in front of an A-10C Thunderbolt II engine after successfully completing the final engine test at Davis-Monthan Air Force Base, Arizona, April 30, 2026. The test marked a key step in verifying the engine’s performance and ensuring it is ready to support A-10C flight operations. (U.S. Air Force photo by Senior Airman Christopher Ornelas Jr.)
| Date Taken: | 04.30.2026 |
| Date Posted: | 05.27.2026 16:48 |
| Photo ID: | 9710951 |
| VIRIN: | 260430-F-UE447-1201 |
| Resolution: | 5742x3820 |
| Size: | 1.52 MB |
| Location: | US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, A-10 engine build marks closing chapter at Davis-Monthan [Image 15 of 15], by SrA Christopher Ornelas, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.