Kiewit-Alberici contractors drill, install, grout and cap anchors in dry dock 4 on January 12, 2026 during a dry dock seismic retrofit at Puget Sound Naval Shipyard & Intermediate Maintenance Facility in Bremerton, Washington. (U.S. Navy photo by Jeb Fach)
| Date Taken: | 01.12.2026 |
| Date Posted: | 05.28.2026 14:46 |
| Photo ID: | 9692129 |
| VIRIN: | 260122-N-TS621-1012 |
| Resolution: | 3833x5750 |
| Size: | 9.06 MB |
| Location: | BREMERTON, WASHINGTON, US |
| Web Views: | 17 |
| Downloads: | 2 |
This work, During the dry dock seismic retrofit project, Kiewit-Alberici contractors drill, install, grout and cap anchors to dry dock 4 on January 12, 2026. [Image 2 of 2], by Jeb Fach, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.