(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Laying the Future of Barracks Construction [Image 1 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Laying the Future of Barracks Construction

    EL PASO, TEXAS, UNITED STATES

    08.27.2024

    Photo by Patrick Adelmann 

    U.S. Army Corps of Engineers, Fort Worth District

    An interior view of the 3D-printed barracks constructed in 2024 as part of a prototype contract with the Defense Innovation Unit and the U.S. Army Corps of Engineers. This is the predecessor to the 10 buildings currently being built at Fort Bliss, Texas. The photo shows the dormitory-style living space inside the completed barracks. Each barracks also includes latrines, showering facilities, and washers and dryers.

    IMAGE INFO

    Date Taken: 08.27.2024
    Date Posted: 04.01.2026 11:17
    Photo ID: 9593856
    VIRIN: 240827-A-XY212-1008
    Resolution: 6048x4024
    Size: 4.46 MB
    Location: EL PASO, TEXAS, US

    Web Views: 6
    Downloads: 0

    PUBLIC DOMAIN