Bourne, Ma. – Sgt. Benjamin De Andrade, with the 181 Engineer Vertical Construction Company, clears snow from sidewalks in Bourne, Ma. February 25, 2026. Soldiers from the Massachusetts National Guard have been activated in response to a blizzard that impacted Massachusetts, dropping up to 30 inches of snow in some areas on February 23, 2026. (U.S. Army photo by Sgt. 1st Class Steven Eaton)
| Date Taken: | 02.25.2026 |
| Date Posted: | 02.25.2026 19:23 |
| Photo ID: | 9537215 |
| VIRIN: | 260225-Z-JK986-1019 |
| Resolution: | 6720x4480 |
| Size: | 5.59 MB |
| Location: | BOURNE, MASSACHUSETTS, US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, Massachusetts Engineers Respond To Blizzard in Bourne [Image 13 of 13], by SFC Steven Eaton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.