The Dry Dock 4 project team uses a crane to lower an anchor system into a newly drilled hole in the dry wall at Puget Sound Naval Shipyard & Intermediate Maintenance Facility in Bremerton, Washington, January 22, 2026. (U.S. Navy photo by Jeb Fach)
| Date Taken: | 01.22.2026 |
| Date Posted: | 02.05.2026 13:18 |
| Photo ID: | 9508276 |
| VIRIN: | 260122-N-TS621-1002 |
| Resolution: | 4991x3327 |
| Size: | 6.89 MB |
| Location: | BREMERTON, WASHINGTON, US |
| Web Views: | 13 |
| Downloads: | 2 |
This work, PSNS & IMF seismic retrofit [Image 3 of 3], by Jeb Fach, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.