The Swimming Pool complex completed March 4, 2025, at Tyndall AFB, Florida has four racing lanes, lifeguard stations, a shallow-end gradual slope entrance with a safety handrail, and a safety powered lift chair. The complex features two splash pads with canopies, a concession stand, bathhouse with lockers and changing stalls.
(U.S. Air Force Photo by Christine Alombro Walker)
| Date Taken: | 03.06.2025 |
| Date Posted: | 01.27.2026 11:32 |
| Photo ID: | 9490468 |
| VIRIN: | 260123-F-QF062-1010 |
| Resolution: | 5849x3899 |
| Size: | 2.68 MB |
| Location: | PANAMA CITY, FLORIDA, US |
| Web Views: | 0 |
| Downloads: | 0 |
This work, The Rebuilders: A Look at the AFCEC NDR Division’s Construction Milestones [Image 6 of 6], by christine walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.