The Emergency Operations Center was officially turned over and accepted by the 325th Civil Engineer Squadron Commander on February 7, 2025. The EOC is constructed to withstand 165 mph hurricane force winds and has over 21-thousand square feet of upgraded workspaces, security enhancements, sleeping quarters and dining area for a 59-member team to remain and conduct emergency operations. (U.S. Air Force Photo by Christine Alombro Walker)
| Date Taken: | 12.03.2025 |
| Date Posted: | 01.27.2026 11:32 |
| Photo ID: | 9490422 |
| VIRIN: | 260123-F-QF062-1004 |
| Resolution: | 5588x4000 |
| Size: | 5.35 MB |
| Location: | PANAMA CITY, FLORIDA, US |
| Web Views: | 0 |
| Downloads: | 0 |
This work, The Rebuilders: A Look at the AFCEC NDR Division’s Construction Milestones [Image 6 of 6], by christine walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.