MONCURE, N.C. — Anthony Watts, a marine machinery mechanic with the U.S. Army Corps of Engineers Wilmington District, installs a temporary ladder system at the outlet conduit of B. Everett Jordan Dam in January 2025. The access system allows engineers to safely enter the conduit to conduct a comprehensive structural inspection of the dam’s primary outlet works.
| Date Taken: | 01.10.2026 |
| Date Posted: | 01.14.2026 11:25 |
| Photo ID: | 9479231 |
| VIRIN: | 260110-A-XB412-2905 |
| Resolution: | 2400x4032 |
| Size: | 2.29 MB |
| Location: | US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, USACE conducts critical safety inspection of B. Everett Jordan Dam outlet conduit [Image 3 of 3], by Ernest Henry, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.