(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Comprehensive scale model guides mega dam safety project for spillway improvements [Image 14 of 14]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Comprehensive scale model guides mega dam safety project for spillway improvements

    Jay Ling (left), Garrison Dam Spillway Modification Project program manager and Ryan Leigh, geotechnical engineer, both from the U.S. Army Corps of Engineers, Omaha District, discuss a 1:55-scale comprehensive model of the Garrison Dam spillway during a three-day design workshop at the U.S. Army Engineer Research and Development Center in Vicksburg, Mississippi, December 11, 2025. The project is the largest dam safety modification project in the history of the U.S. Army Corps of Engineers and will improve the safety and structural integrity of the Garrison Dam in North Dakota. (U.S. Army Corps of Engineers photo by Delanie Stafford)

    IMAGE INFO

    Date Taken: 12.11.2025
    Date Posted: 12.30.2025 11:03
    Photo ID: 9463837
    VIRIN: 251211-A-KS317-1024
    Resolution: 3300x2213
    Size: 2.71 MB
    Location: US

    Web Views: 4
    Downloads: 1

    PUBLIC DOMAIN